BCU

Case Study For BCU

Client Information:

Client: Birmingham City University
Contractor: Willmott Dixon
Architect: Associated Architects
Location: Birmingham
Completion Date: January 2018

Project Summary:

The completion of Birmingham City University - Curzon B & Royal Birmingham Conservatoire forms part of the University’s £260 million dedicated investment into
new and advanced facilities.

Designed by Associated Architects to provide 100,000 square feet of additional facilities the £31 million Birmingham City – Curzon B Building officially opened in January 2018. The facility offers teaching and learning space for 3,000 students and staff.

As a local preferred supplier Excelsior were engaged by Birmingham based Willmott Dixon to supply and install the washrooms. T-Line Cubicle Range offered the
perfect solution, with an extruded aluminium frame, inclusive of pilaster and headrail, coupled with Solid Grade Laminate Doors and Divisions ensure a robust
cubicle that will stand the test of time.

Available Finishes:

These Systems Are Available In The Following Finishes:
High Pressure Laminate
High Gloss Laminate

T-Line Cubicles

Specification

Product Range: T Line SGL
Doors: 12mm Solid Grade Laminate, Noisetier Naturel N056
Pilaster: Extruded Aluminium Pilaster
Partition: Partition: 12mm Solid Grade Laminate, Gris Orage G059
Ironmongery: Satin Anodised Aluminium

Mariner
Duct Panelling

Specification

Product Range: Mariner Duct Panelling
Panels: 12mm Solid Grade Laminate, Gris Orage G059
Flash Gaps: 18mm MR Core, Gris Orage G059
Sub-Frame: 18mm MR MDF
Sole Plate: 25mm WBP PLY

Vanity
Wash Trough


Specification

Product Range: Accessories
Vanity Top: Hi Macs, 13.5mm Pebble Pearl,G107
Access Panels: 12mm Solid Grade Laminate, Noisetier Naturel N056
Flash Gaps: 12mm Compact Density Fibreboard, Noisetier Naturel N056
Sub Frame: 18mm MR MDF
Sole Plate: 25mm WBP PLY