Newport 6th Form School

Case Study For Newport 6th Form School

Newport 6th Form School

Newport 6th Form School

Client Information:

Client: Newport 6th Form School
Contractor: A M Griffiths
Architect: Lucas Architects
Location: Shropshire
Completion Date: April 2018

Available Finishes:

These Systems Are Available In The Following Finishes:
High Pressure Laminate
High Gloss Laminate

Project Summary:

Newport School expansion for a Sixth Form Centre has been eagerly awaited by the students and local community.

Built to house teaching, exhibition and social learning spaces is not only a step forward to the school and its pupils but serves the wider community also.

Built by AM Griffiths, this two storey 1500sqm project was handed over to the client early 2018.

Exceslsior’s Flush 30 Range has been installed in the washroom areas. The solid 30mm flush frontage on a 150mm leg affords the client and user a very high end robust system.

Flush 30
Toilet Cubicles

Specification

Product Range: Flush 30 Cubicle
Doors: High Pressure Laminate PUR bonded onto 28mm MR Core, Formica F7912 Storm
Pilaster: High Pressure Laminate PUR bonded onto 28mm MR Core, Formica F7912 Storm
Partition: High Pressure Laminate PUR bonded onto 18mm MR Core, Formica F7912 Storm
Ironmongery: Stainless Steel

Magma
Trough Vanity TR/SL2

Specification

Product Range: Magma Trough Vanity TR/SL2
Top: 13mm Solid Surface Hanex S-006 Grey
Panels: 12mm Solid Grade Laminate, Formica F7912 Storm
Flash Gaps: 12mm Compact Density Fibreboard, Formica F7912 Storm
Worktop Sub Frame: Zinc Plated and Powder coat finished 38 x 38mm Steel Box section Cantilevered Frame Supports
Sub Frame: 18mm MR MDF

Mariner
Duct Panelling

Specification

Product Range: Mariner Range Duct Panelling
Panels: 12mm Solid Grade Laminate, Formica Lime F4177
Flash Gaps: 18mm MR Core, Formica Lime F4177
Sub Frame: 18mm MR MDF
Sole Plate: 25mm WBP PLY