Uttoxeter Leisure Centre

Case Study For Uttoxeter Leisure Centre

Client Information:

Client: East Staffordshire Borough Council
Contractor: B & K Construction
Architect: Pozzoni
Location: Uttoxeter
Completion Date: January 2015

Available Finishes:

These Systems Are Available In The Following Finishes:
Natural Wood Veneer
High Pressure Laminate
High Gloss Laminate

Project Summary:


Following an extensive £3.9m refurbishment Uttoxeter Leisure Centre officially opened its doors to the public on Saturday 17th January 2015. The centre now features a new state of the art Gym, Fitness Studio, Cafe, Village Style Changing Facilities and improved Swimming Pool with seating for up to 140 spectators.

Working closely with Bowmer & Kirkland Excelsior created the high end Changing Village the like of which you would expect to see in a private club. Being part of this project and completing another successful Hydroline Cubicle and Seat Benching installation has been an absolute pleasure for all the team involved in the project.

The opening of the centre was performed by 50meter Breaststroke World Record Holder and Commonwealth Gold Medallist Adam Peaty who will be using the facility as part of his ongoing training regime.

Hydroline
Toilet Cubicle

Specification

Product Range: Hydroline 12mm Solid Grade Laminate
Doors: Formica F6932
Pilaster: Formica F7966
Partition: Formica F7966
Ironmongery: SAA RAL 9006 Silver

Mariner
Duct Panels

Specification

Product Range: Mariner 12mm Solid Grade Laminate Duct Panelling
Panels: Formica F6932
Flash Gaps: Formica F7966

Select
Vanity Unit


Specification

Product Range: Magma Vanity Unit
Panels: Formica F6932
Flash Gaps: Formica F7966
Vanity Top: Quartz 814