Francis Barber | SEND.
Working alongside Baxall Construction, Excelsior have delivered a wall and duct panelling solution designed to withstand the demands of a busy educational setting for the Francis Barber SEND learning environment in South West London.
The Challenge
The project required a robust finish to support the practical requirements of the Special Educational Needs and Disabilities (SEND) facility.
The Solution
Specified for its durability, hygiene and long-term performance, our Mariner wall and duct panelling system was installed, designed to meet the needs of an accessible washroom, in accordance with Part M principles. The metal-framed construction provides a strong and reliable substrate for the installation of grab rails and associated accessibility features, helping to create safe, inclusive and user-focused spaces within the SEND environment.



Mariner Wall & Duct Panelling
Specification
Duct Panel: 12mm Compact Grade Laminate
Flash Gap: 12mm Solid Grade Laminate
Stile Material: 48x38/26mm Galvanised Metal
Floor Rail Material: 50x25mm Galvanised U Channel
Finish:
Duct Panel: Polyrey B048 Bleu Oslo
Flash Gap: Polyrey B048 Bleu Oslo