Client Information:
Client:
Yorkswood Primary School
Contractor:
Interclass Plc
Architect:
Solihull Council
Location:
Birmingham
Completion Date:
Ongoing
The Challenge
The Architects vision for the washrooms was to create a vibrant, innovative space with multi coloured cubicles working in harmony throughout the colour pallet.
The challenge for us was to ensure full usage of the core material was utilized throughout the scheme to ensure optimal yield and competitive pricing.
Construction took place alongside the existing occupied school buildings, and therefore keeping the school operational and safeguarding the pupils and staff was an important factor for this project.
The Solution
Repeating the pallet throughout the washroom areas ensured as much of the core material as possible was utilised.
Harlequin Mariner & Harlequin Peardrop Cubicles and Duct panelling were used through the scheme.
Solid Grade Laminate is the perfect choice of material for the Education Sector offering extremely high levels of durability.
Harlequin Mariner Cubicles
Specification
Product Range: Harlequin Mariner
Doors: 20mm Laminate Faced Compact Density Fibreboard
Pilaster: 12mm Compact SGL, Polyrey Érable Nordique E028
Partition: 12mm Compact SGL, Polyrey Érable Nordique E028
Ironmongery: SBAA
Mariner Duct Panelling
Specification
Product Range: Mariner Duct Panelling
Panels: 12mm Solid Grade Laminate
Flash Gaps: 12mm Compact Solid Grade Laminate
Sub-Frame: Aluminium Frame
Sole Plate: 25mm WBP PLY
Peardrop Range
Specification
Product Range: Peardrop
Doors: 20mm Laminate Faced Compact Density Fibreboard
Pilaster: 12mm Compact Solid Grade Laminate
Partition: 12mm Compact Solid Grade Laminate
Ironmongery: SBAA
Available Finishes:
These Systems Are Available In The Following Finishes:
• High Pressure Laminate
• High Gloss Laminate