Opus Energy Ltd: Commercial Restrooms

Case Study

Project Summary:

Following Opus Energy’s momentous growth over its 15-year history, their move to the John Dryden House will consolidate their four current sites and house all employees working in Northampton under one roof.

With the new premises, Opus Energy expects to have an almost 800 strong Northampton workforce, highlighting its prominence as a key local employer. The refurbishment of the property has seen state of the art facilities, and with investment into sustainability opportunities, will enable the business to be carbon neutral.

Commercial Toilet and Shower Refurbishment

Client Information:

Client:
Opus Energy Ltd

Contractor:
Overbury Central Unit

Architect:
Northampton Building Consultancy

Location:
Northampton

Completion Date:
September 2017

The Challenge

Work within tight lead times to supply deliver and install the project.

Offer a cost-effective system suitable for the environment intended.

Propose a selection of classic High Pressure Laminae finishes that will deliver a timeless décor.

The Solution

Excelsior Select Range of Cubicle’s in 20mm High Pressure Laminate fell within budget and met with the Architects Specification.

A combination of Polyrey finishes created the classical, timeless façade desired by the client.

Select Cubicles

Specification

Product Range: Select
Doors: 18mm MR Core HPL Polyrey B101 Banian Noirci
Pilaster: Polyrey B101 Banian Noirci
Partition: Partition: Polyrey B015 Blanc Menuires
Ironmongery: Excelsior SBAA

Vanity Wash Trough

Specification

Product Range: Select
Vanity Top: 12mm Laminated CDF Polyrey B101 Banian Noirci
Vanity Panels: HPL 18mm MR Polyrey B015 Blanc Menuires
Frame: Polyrey B015 Blanc Menuires