Altrincham Business Park, Flush 30

Case Study For Altrincham Business Park

Flush 30 Altrincham Business Park

Flush 30 Altrincham Business Park

Client Information:

Client: Altrincham Business Park
Contractor: TSK Group Ltd
Architect: SpaceInvader Architects
Location: Altrincham
Completion Date: April 2018

Project Summary:

Altrincham Business Park located in the South of Manchester has 85,000sq ft of developed office space.

The newly refurbished accommodation designed by SpaceInvader Architects was managed and delivered by TSK Group. The enviable location and contemporary
working environment ensures this building will be occupied by very happy tenants.

Excelsior’s Flush 30 Cubicle system was chosen and installed in the washrooms to
stunning effect. The aluminium rebated framed door provides a contemporary element that is durable and robust.

In addition to the office space the building will be open to the public at ground floor level encouraging passers-by to visit the coffee bar.

The recent adaptation of this system to incorporate a rebated aluminium frame is justifiably proving extremely popular with both Architects and Specifiers.

Available Finishes:

These Systems Are Available In The Following Finishes:
Natural Wood Veneer
High Pressure Laminate
High Gloss Laminate

Flush 30 Cubicle
(Floor to Ceiling)

Specification

Product Range: Flush 30 HPL
Doors: HPL Bonded onto 28mm MR Core, Polyrey B100 Banian Blanchi
Pilaster: HPL Bonded onto 28mm MR Core, Polyrey B100 Banian Blanchi
Partition: Partition: HPL Bonded onto 18mm MR Core, Polyrey B070 Blanc Megeve
Ironmongery: SBAA

Select
Duct Panelling

Specification

Product Range: 20mm HPL Select Duct Panels
Panels: HPL Bonded onto 18mm MR Core, Polyrey B070 Blanc Megeve
Flash Gaps: HPL Bonded onto 18mm MR Core, Polyrey G003Gris Perle
Sub-Frame: 18mm MR MDF
Sole Plate: 25mm WBP PLY

Vanity
Select Range


Specification

Product Range: Select Vanity
Vanity Top: CDF, Polyrey Premier M022 Marbre Veneto
Vanity Base: Powder coated Galvanised Steel