Skyline features
Perfect for locations where greater user privacy is required. The Skyline system is an extension of our proprietory height cubicle systems providing a floor to ceiling application with an aluminium floor channel or an alternative pedestal leg option to create a standard floor clearance.
The Skyline range is available in 2 different specification board options to meet both budget and durability requirements.
Hardware is available in a standard aluminium finish with bespoke colours and finishes available on request at an additional cost.
Panel and door colours can be selected from a large range of preferred laminate manufacturers.
Doors with 100mm infill panels supplied as standard detail. Colour to match pilasters c/w matching internal cross rail panel. (full height doors available upon request).
Wall & duct panelling and fully framed vanity units can be supplied to complement this system.
The Skyline cubicle range is available on a typical delivery basis of 3-4 weeks from receipt of approved drawings and confirmation of all colour finishes.
Installation by Excelsior is strongly recommended but not essential as a full set of fixing instructions and technical information is provided with the system.
Recommended sectors:
- Commercial Offices
- Leisure
Aluminium ironmongery
1
Indicator Faceplate
2
Indicator Slide Bolt
3
Aluminium Leg
4
Aluminium Hinge
Downloads
From creation to installation... you can rest assured
Excelsior have undertaken the manufacture, supply and installation of bespoke washroom products in all washroom environments since 1978. We have a wide selection of safe, attractive and reliable systems to suit all applications, from Nursery Schools right through to Leisure Centres and Hospitals.
Skyline 12mm SGL cubicles
Floor to ceiling
Specifications
Doors, divisions & pilasters:
- 12mm Solid Compact Grade Laminate
- Black core radius & polished edge finish
Standard dimensions:
- Up to 2700mm as standard x 1500 deep
Ironmongery:
- Rise and fall aluminium hinges Ref: EXH-A13
- Recessed Indicator and Keep Ref: EXL-A13
- Coat Hook - Ref:EXCH-A13
- Brackets - 13mm SAA Division U-Channel 13mm SAA Wall Pilaster J-Channel
- Headrail - Ref: EXPHR13
- Division base rail 13mm SAA U-Channel
Toilet roll holder & accessories available upon request
Skyline 20mm HPL cubicles
Floor to ceiling
Specifications
Doors, divisions & pilasters:
- High Pressure Laminate PUR bonded onto 18mm MR core
- 2mm ABS edge finish
Standard dimensions:
- Up to 2700mm floor to ceiling height x 1500mm deep
Ironmongery:
- Rise and fall aluminium hinges Ref: EXH-A20
- Recessed Indicator and Keep Ref: EXL-A20
- Coat Hook - Ref:EXCH-A20
- Brackets - 20mm SAA Division U Channel 20mm SAA Wall Pilaster J-Channel
- Headrail - Ref: EXPHR20
- Division base rail 20mm SAA U-Channel
Toilet roll holders & accessories available upon request
SGL - Compact Solid Grade Laminate
- Protective overlay for printed decors.
- Decorative paper impregnated with melamine resin.
- Multiple layers of kraft paper impregnated with phenolic resin, to form a rigid exposed core with a radiused, polished edge.
HPL - High Pressure Laminate
- Protective overlay for printed decors.
- Decorative paper impregnated with melamine resin.
- Multiple layers of kraft paper impregnated with phenolic resin, to form a rigid exposed core with a radiused, polished edge.
Additional information
Ironmongery finish: Excelsior Semi Bright Anodised Aluminium as standard. (Stainless Steel available on request).
Colour selections: Excelsior preferred cubicle & washroom colour selection.
Bolt through fixings are supplied with all hinge packs and we strongly recommend the use of these on the cubicle system fronts (please note these are not fitted as standard)
Special notes: Outward opening doors complete with back to back Aluminium ‘D’ Handles and full length ‘Z’ Section door Stop/Keep
We recommend that outward opening doors open onto an adjacent solid wall to prevent overstrain on hinges.
BIM objects - typical layouts
Downloadable BIM objects
Our BIM families are a time saving development with fully functional parametric objects. This highly acclaimed 3D model-based process is specifically designed for Infrastructure and Building projects. It offers many benefits to owners that enable simplicity for project management.
- Visualisation of designs
- Simulation of multiple design ideas
- Productivity improvement
- Analysing and testing of application and performance
BIM enables collaborative working; management of information as ‘one team’ within a digital model holding all the information required to design and construct the project from conception to completion.