Wigston Leisure Centre

Case Study

Project Summary:

Oadby & Wigston Borough Council have invested £4m into the refurbishment of the 1960’s Wigston Pool & Fitness Centre, the new state of the art facility boasts a high quality 60 station Gym a brand new 6 lane 25meter Swimming Pool, a Sauna and excellent new changing facilities.

Excelsior are very pleased to have worked again with Morgan Sindall and S&P Architects successfully installing our Mariner Cubicle Range and Hydroline Locker & Benching Range.

The old tired facility has been completely transformed and now resembles a high end private health club providing a welcoming & inspiring space for people of all ages.

“This is a very exciting time for the community of Wigston helping to make a positive difference to people’s lives".

Wigston Leisure Centre

Client Information:

Client:
Oadby and Wigston Borough Council

Contractor:
Morgan Sindall

Architect:
AFLS&P Architects

Location:
Leicestershire

Completion Date:
December 2015

Mariner Toilet Cubicle

Specification

Product Range: Mariner 12mm Solid Grade Laminate Cubicles
Doors: Arpa C009
Pilaster: Arpa 0527
Partition: Arpa 0527
Ironmongery: Aluminium

Mariner Duct Panelling

Specification

Product Range:Mariner Duct Panels
Panels:Arpa 0509
Flash Gaps:Arpa C009

Mariner Vanity Units

Specification

Product Range: Mariner Vanity Units
Panels: Arpa C009
Flash Gaps: Arpa 0509
Vanity Top: Arpa 3194

Available Finishes:

These Systems Are Available In The Following Finishes:

  • Natural Wood Veneer
  • High Pressure Laminate
  • High Gloss Laminate

Get in touch with Excelsior....


    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.