Jubilee Wood Primary School

Case Study For Jubilee Wood Primary School.

Client Information:

Client: Jubilee Wood Primary School
Contractor: Wates Construction
Architect: Jestico & Whiles
Location: Milton Keynes
Completion Date: July 2016

Project Summary:

Jubilee Wood Primary School selected Excelsior Skyline Range, a full height system with overhead panel. This extremely popular range is an ideal choice for school environments meeting the demands of modern education and providing complete privacy and comfort to the user.

Full height cubicle systems have increased in popularity over the past few years. Skyline Range enables Schools, Colleges and the like to ensure both safety and anti-bulling objectives are met and Excelsior’s rise and fall hinge paired with the bespoke door design enables lift off access in the event of an emergency.

Skyline range is an extremely durable system and comes as standard with a ‘P’ section headrail, ‘U’ channel baserail and over-panel providing maximum stability. Optional bolt through fixings are available and recommended.

The successful open plan arrangement of cubicles and solid surface vanities in Orange and Pomme Verte is in keeping with the modern vibrant atmosphere of the school

Available Finishes:

These Systems Are Available In The Following Finishes:
Natural Wood Veneer
High Pressure Laminate
High Gloss Laminate

Skyline
Toilet Cubicle

Specification

Product Range: Skyline 20mm HPL Cubicle
Doors: Pomme Verte P092 / Orange L122
Pilaster: Gris Orage G059
Partition: Gris Orage G059
Ironmongery: Aluminium

Select
Duct Panelling

Specification

Product Range: Select HPL 20mm Duct Panels
Panels: Pomme Verte P092 / Orange L122
Flash Gaps: Gris Orage G059

Mariner
Vanity Trough


Specification

Product Range: Mariner Vanity Trough
Panels: Pomme Verte P092 / Orange L122
Front Panel set at an angle: Solid Grade Laminate
Flash Gaps: Pomme Verte P092 / Orange L122
Vanity Top: Corian Glacier White